[block_2]
A team of highly skilled engineers began work on site on the Ouse Bridge on the M62 in Yorkshire in May 2018 and over the past two years they have replaced over 200 bridge bearings largely out of sight of drivers. The bearings support the bridge and allow it to move in a controlled way during changes in temperature and weather.