The Exceat Bridge Scheme that will cost in region of £8 Million has been approved by the South Downs National Park Authority.
[block_2]
It involves the realignment and replacement of an existing single lane bridge at the A259 over the river Cuckmere, with a new two way, two lane bridge with a footpath, including re-profiling of the river and road embankments.