The Exceat Bridge Scheme that will cost in region of £8 Million has been approved by the South Downs National Park Authority.
It involves the realignment and replacement of an existing single lane bridge at the A259 over the river Cuckmere, with a new two way, two lane bridge with a footpath, including re-profiling of the river and road embankments.