A key milestone in construction of Fastrack, Dover’s first purpose-built zero-emission bus route, takes place on the weekend of Friday 14 to Monday 17 July as a new 31.5m span bridge is installed across the A2 at Whitfield.
A short stretch of the A2 from the Whitfield roundabout to the Whitfield interchange (A256 junction) will be closed to all traffic from 9.00pm on Friday, 14 July to 5.00am on Monday, 17 July.