Efforts are underway to establish a temporary single-lane route on A29 in Pulborough, following the recent clearing of vegetation by the County Council’s highway contractors. Tree branches and limbs that extended over the road were removed to make way for the installation of concrete blocks needed for partial reopening.
[block_2]
This week, contractors have placed concrete blocks on both sides of Church Hill’s affected section, creating an interlinked 50-meter barrier that will form a sturdy, protected single-lane carriageway in the middle of the road. The last of these blocks will be installed today, Friday, April 14.