The popular swimming pools at the King Alfred Leisure Centre in Brighton will be re-opening on Saturday, April 1, following extensive repair work. The pools, which are managed by Freedom Leisure on behalf of the council, have been closed since 6th January due to a breakdown in the main boiler control panel and boilers, resulting in the building being left without hot water or heating.
[block_2]
After significant repair work, the pool has now been gradually re-heated to the correct temperature for swimming, and the centre is set to welcome back swimmers in time for the Easter holidays.